Huangshi Coal-fired Project in Hubei (Phase I)

Huangshi Coal-fired Project in Hubei (Phase I)

Huangshi I coal-fired project is comprised of an inseparable 50% interest in a 200 MW unit (Part I) and two 330 MW units (Part II), totaling 760 MW. Part I is located in Huangshi City, 120 km from Wuhan, the capital of Hubei Province. Part II is located on the outskirts (Xisaishan) of Huangshi City, approximately 10 km from Part I, and about 400 m from the Yangzi River.

Huangshi Coal-fired Project in Hubei (Phase II)

Huangshi Coal-fired Project in Hubei (Phase II)

Huangshi II coal-fired project has a gross capacity of 1,360.0 MW and is a base load facility located in Huangshi, near Wuhan, the capital of Hubei province. Huangshi II coal-fired project consists of two domestically manufactured ultra super critical coal fired units with a gross capacity of 680.0 MW. Unit 1 commenced commercial operation in December 2010, and Unit 2 commenced commercial operation in April 2014.

Total Installed Capacity: 2,120 MW
Fuel Type: Coal
COD: 1993 & 2005 (Phase I); 2010 (Unit 1, Phase II); 2014 (Unit 2, Phase II)