Yulchon Gas-fired Project in Korea (Phase I)

Yulchon Gas-fired Project in Korea (Phase I)

Yulchon Power Project is a 577.4 MW gas-fired combined cycle power project with an intermediate to peaking facility located at the Yulchon Industrial Complex, Jeollanam-do, in the southern part of the Korean peninsula.

Total Installed Capacity: 577.4 MW
Fuel Type: Liquefied natural gas
COD: 2005

Yulchon Gas-fired Project in Korea (Phase II)

Yulchon Gas-fired Project in Korea (Phase II)

Yulchon II Power Project is a 946.3 MW gas-fired combined cycle power project located adjacent to Yulchon I Power Project at the Yulchon Industrial Complex, Jeollanam-do, in the southern part of the Korean peninsula. Yulchon II Power Project achieved combined cycle COD in April 2014.

Total Installed Capacity: 946.3 MW
Fuel Type: Liquefied natural gas
COD: 2014

Yulchon  Fuel Cell Project in Korea

Yulchon Fuel Cell Project in Korea

The Yulchon Fuel Cell Project consists of 15.4 MW of fuel cell projects, comprising a Phase I 4.8 MW fuel cell project, a Phase II 5.6 MW fuel cell project and a Phase III 5 MW fuel cell project.

Total Installed Capacity: 4.8 MW (Phase I); 5.6 MW (Phase II); 5 MW (Phase III)
Fuel Type: Liquefied natural gas
COD: 2009 (Phase I); 2011 (Phase II); 2015(Phase III)